A Recent Installation By Ukbathroomguru In Headingley, Leeds
Case Study
We looked at the existing bathroom during a free site survey and worked with the customer to produce a plan and a detailed estimate to work to.
We then installed the bathroom from start to finish in a couple of weeks (which is a fairly typical timescale)
We insulated all the external walls prior to tiling and plastering to ensure the room was kept warm and free from damp.
We also removed the old clunky cylinder cupboard to open out the room a bit….
and added a wall-hung vanity unit to add a bit of storage space to keep the room clutter-free.
We also replaced the shower with a bath.
The customer chose to only tile the shower area and behind the basin to maintain a minimalist look – the rest of the walls were painted with an anti-mould paint.
Removing the old cylinder cupboard, whilst replacing (and then decorating) the boxed-in section that covered the stairwell made the room appear larger.
Trades Involved
The work involved plumbing in the new suite but also a few other trades:
- All planning, procurement and design where necessary
- Ripping out & disposing of the old suite
- Wall insulation (see picture above)
- Wall tiling
- Vinyl floor fitting
- Plastering
- Painting & decorating
- Minor electrics (fitting new lighting)
However, our customers didn’t have to find all these people independently (or find a multi-skilled individual) as we do everything from start to finish!
Thanks For Reading
If this sounds like something that you would like to accomplish with your bathroom then please get in touch for a free site survey…
Chris